Project Name : M&M (Mahindra & Mahindra)
Role : ABAP Consultant
Location : India
Duration : Feb 2016 to Sep 2016
- Integration between SAP and Salesforce is used to synchronize data between the two systems
- Developed RFC’s to send customer master, vendor master data and also to update FI transactions using RFC’s etc
- Involved in the design and development of creating RFC’s for SFDC Integration
Project Name : Hilmar
Role : ABAP Consultant
Location : India
Duration : Oct 2014 to Dec 2015
- Hilmar Cheese Company is a leading producer of wholesome dairy products that contribute to the success of all stakeholders
- Committed to innovation and sustainability, Hilmar Cheese Company, and its division, Hilmar Ingredients, serves customers in more than 50 countries
- And convert an abundance of high-quality milk into a variety of nutritious cheeses, whey protein, lactose, and milk powders
- Involved in the development of script Customer certificate of Analysis in QM
- Involved in the development of script related to pick list of WM
- Involved in the development scripts related to QM module
- Provided END to End Support for Project Implementation and Post go live support
- Developed an application for the supplier portal using webdynpro
Project Name : Multi Source Consolidation Project with Global ATP
Role : ABAP Consultant
Location : India
Duration : March 2014 to Oct 2014
- Companies operating worldwide are forced to globalize available information in order to conduct business efficiently
- Specifically, this means that information has to be made available across system boundaries as quickly as possible to provide optimized decision support
- Global ATP can be used in heterogeneous system landscapes to provide required information as quickly as possible
- Global ATP is one of the central methods of SAP APO
- Involved in the development of sending product master data from ECC to APO System using CIF Enhancement
- Involved in implementing a BADI to overwrite the default delivery plant at SO line item level
- Involved in the development of adding a check box in ME59N transaction for per Purchase requisition tracking number and implemented the functionality for the same
- Implemented OSS Notes
- Implemented BADI to update delivery priority in ME22N transaction
- Implemented BADI to enable characteristic value functionality in SO in APO System
Project Name : Symphony - PI Upgrade
Role : ABAP Consultant
Location : India
Duration : Aug 2013 to Oct 2013
- Project dealt with the upgrade of ECC system from 6.0 to 7.3.1 version and has handled the fixes related to the interfaces in the custom program end
- Lead and handled the project and was involved in resolving the high priority issues during the Upgrade of ECC systems related to only interfaces
- Provided end to end support during implementation of fixes and post go live support
- Designed and implemented technical solutions for delivery split, batch split scenarios during picking and goods issuing
- Designed Custom message control solution and IDOC generation FM to propose and process ALE output type for material document transaction
- Implemented customer exits for populating the enhanced segments of the extended IDOCs of Customer master and material master
Project Name : Dhow
Role : ABAP Consultant
Location : India
Duration : Feb 2013 to Aug 2013
- Project dealt with the upgrade of ECC system from 6.0 to 7.3.1 version and has handled the fixes related to the interfaces in the custom program end
- Lead and handled the project and was involved in resolving the high priority issues during the Upgrade of ECC systems related to only interfaces
- Provided end to end support during implementation of fixes and post go live support
- Designed and implemented technical solutions for delivery split, batch split scenarios during picking and goods issuing
- Designed Custom message control solution and IDOC generation FM to propose and process ALE output type for material document transaction
- Implemented customer exits for populating the enhanced segments of the extended IDOCs of Customer master and material master idocs
Project Name : U2K2
Role : ABAP Consultant
Location : India
Duration : Dec 2010 to Feb 2013
- U2K2 is a business transformation programme to support achievement of the AACEE Vision by strengthening the One Unilever operating framework in the Region, leveraging Unilever’s scale further and implementing one way of working enabled by SAP with one SAP instance
- Involved in the development of WMS interfaces for SD and MM Scenarios like inventory movement, stock status handling and pick confirm
- Designed Technical solution for interfacing master data – Material master, Customer master, Price master, Credit master, salesman details to various third party systems
- Designed interfaces for reflecting the stock movements across the storage locations/plants or stock status changes occurring at WMS to SAP system
- Designed automated solution for processing of subcontract POs by building interfaces between SAP and WMS system
- Designed Custom message control solution and IDOC generation FM to propose and process ALE output type for material document transaction
- Pre Go-Live activities – Transportation of objects to production system, performed required manual configurations in the production system, Master data download, dry run and handover KT to Support team