Summary
Overview
Work History
Education
Certification
Software
Timeline
Generic
OLEKSANDRA LUKYCHOVA

OLEKSANDRA LUKYCHOVA

Senior Drilling Engineer
Ukraine, Ivano-Frankivsk

Summary

Professional in drilling industry with solid background in engineering principles and field operations. Skilled in well planning, drilling optimization, and safety procedures. Strong collaborator focused on achieving operational efficiency and project success. Reliable and adaptable, with keen ability to navigate changing project demands and team dynamics.

Overview

12
12
years of professional experience
5
5
Certifications
1
1
Language

Work History

Drilling engineer

HALLIBURTON
05.2022 - Current
  • Review PSL DOSs
  • Perform offset wells analysis
  • Prepare Drilling program
  • Conduct Well Pre-Spud Meeting
  • Tracking and analyzing well time
  • Prepare daily operational reports
  • Perform casing design in StressCheck (Landmark)
  • Perform T&D and hydraulic simulation in Wellplan during well execution and calibrate T&D model accordingly
  • Analyzing Baroid DFG simulation ensuring sufficient drilling parameters maintained for effective hole cleaning
  • Analyzing Surge & Swab simulation and designing casing running speed procedure accordingly
  • Prepare and follow up well operations procedures
  • Monitoring the daily progress of well operations
  • Perform engineering studies to solve recurring problems
  • Capturing Lessons Learnt and project best practices
  • Prepare EOWR
  • Drilling performance Analysis
  • Perform Well after action review
  • Completing well section acceptance doc package for invoicing.

Drilling Engineer (in-house Engineer)

HALLIBURTON
11.2021 - 05.2022
  • Prepare Drilling BOD for planned Prospect wells generated based on 3D seismic interpretation
  • Prepare Offset wells analysis
  • Casing setting depth and size selection
  • Prepare Preliminary Well Trajectory Plan in Compass
  • Casing design calculation in StressCheck
  • Torque & Drag Analysis in WellPlan
  • Hydraulic Simulation in WellPlan
  • Surge&Swab Simulation in WellPlan
  • Collaborate with Sperry on well trajectory plan
  • Collaborate with Cementing PSL on casing cementing design
  • Collaborate with Baroid PSL on drilling fluid design

Drilling engineer

HALLIBURTON
06.2020 - 11.2021
  • Prepare Offset wells analysis
  • Review and approve PSL DOSs
  • Prepare and develop ST drilling programs include planning for formations with total losses and instable shales
  • Prepare and follow up well operations procedures, well time reports
  • Monitoring the daily progress of well operations
  • Capturing Lessons learnt and project best practices
  • Prepare EOWR
  • Drilling performance Analysis

Performance Development Coordinator/HPM

HALLIBURTON
01.2019 - 05.2020
  • Assurance of compliance with HMS Standards and Processes
  • Assurance of HPM Service Delivery Process Control Points compliance
  • Assurance of compliance with Performance Delivery Platform
  • Rig Visits with monthly SQ, HSE Tier 2 Assurance Inspections
  • Facilitating SQ Incident Investigation

Drilling Engineer/HPM

HALLIBURTON
10.2018 - 12.2018
  • Prepare Drilling Program
  • Prepare EOWR
  • Prepare drilling calculation and sequence of operations
  • Drilling performance Analysis
  • Following drilling operations execution accordingly to Drilling Program
  • Work with PSLs regarding cementing operations, drilling fluids, drilling bits, completion and logging programs

Drilling Engineer / Technical Department

KUB-GAS LTD
06.2016 - 07.2018
  • Preparation drilling and completion programs
  • Prepare workover under pressure program with Snubbing Unit
  • Prepare drilling operations procedures
  • Prepare of integrated drilling analysis report
  • Work with drilling, coring, and completion contractors
  • Control and analysis of parameters while drilling

Mechanical Engineer / Technical Department

KUB-GAS LTD
08.2013 - 06.2016
  • Selection of wellhead equipment according to the API 5CT
  • Development of annual and monthly schedule of preventive maintenance
  • Prepare technical drawings of parts and components for drilling equipment
  • Control of require number of spare parts

Education

Masters - Petroleum Engineering

Ivano-Frankivsk National Technical University of Oil and Gas
01.2015

Bachelor - Project Management

Ivano-Frankivsk National Technical University of Oil and Gas
01.2014

Masters - Mechanical Engineering

Ivano-Frankivsk National Technical University of Oil and Gas
01.2013

Certification

Leadership program for Project Management Professionals, duration 8 months, 2025 (eCornell university, USA)

Software

Landmark software applications, such as: WellPlan, StressCheck, Compass, OpenWells, Profile

Timeline

Drilling engineer

HALLIBURTON
05.2022 - Current

Drilling Engineer (in-house Engineer)

HALLIBURTON
11.2021 - 05.2022

Drilling engineer

HALLIBURTON
06.2020 - 11.2021

Performance Development Coordinator/HPM

HALLIBURTON
01.2019 - 05.2020

Drilling Engineer/HPM

HALLIBURTON
10.2018 - 12.2018

Drilling Engineer / Technical Department

KUB-GAS LTD
06.2016 - 07.2018

Mechanical Engineer / Technical Department

KUB-GAS LTD
08.2013 - 06.2016

Bachelor - Project Management

Ivano-Frankivsk National Technical University of Oil and Gas

Masters - Mechanical Engineering

Ivano-Frankivsk National Technical University of Oil and Gas

Masters - Petroleum Engineering

Ivano-Frankivsk National Technical University of Oil and Gas
OLEKSANDRA LUKYCHOVASenior Drilling Engineer